NOR, SOF, LOI and more — plus 17 Letter of Protest scenarios covering the most common disputes at sea. Fill in details, copy the result. Nothing is saved.
🎁 Free trial: 1 of 1 free PDF download/share remaining
📋
Notice of Readiness
📊
Statement of Facts
⚠️
Letter of Protest
🤝
Letter of Indemnity
✅
Notice of Apparent Good Order
📝
Mate's Receipt
📨
Notice of Tender
Vessel & document details
Vessel name
IMO
Master
Port
Berth
Reference no.
Date
Time
ContentOperation / cargo typeQuantity / cargo type
M/V "[VESSEL NAME]"
Reference: REF/VESSEL/2026
Date: [DATE / TIME]
Port: [PORT]
NOTICE OF READINESS
═══════════════════════════════
To: [CHARTERER / RECEIVER]
Dear Sirs,
The above-named vessel under my command has arrived at [PORT] on [DATE / TIME] and is in all respects ready to commence loading/discharging of [QUANTITY / CARGO].
This Notice is tendered without prejudice to any rights under the Charter Party.
Yours faithfully,
____________________
Master, M/V "[VESSEL NAME]"
ACKNOWLEDGMENT:
Received by: _______________ Date/Time: _______________ Signature: _______________
Built for verified crew and companies
Free tools for everyone — plus a verified profile that gets you found directly.
These are standard, general-purpose templates — always review against your vessel's specific Charter Party terms and, for significant claims, seek advice from Owners/P&I before issuing.
About this tool
A template generator for the standard documents masters and chief officers issue in port. It covers the Notice of Readiness, Statement of Facts, Letter of Indemnity, Notice of Apparent Good Order, Mate's Receipt, Notice of Tender and Letters of Protest for scenarios such as shore-caused delay, weather delay, short-landed cargo, cargo damage, unsafe berth, NOR rejection and short bunker delivery.
How to use it
1Choose the document type, and for a Letter of Protest pick the protest scenario.
2Enter vessel name, IMO, port, berth, master, date and time, recipient and reference.
3Add the document-specific details, such as the SOF chronology or the facts of the protest.
4Copy the generated text into your own letterhead or email, or save a draft in your browser.
Frequently asked questions
When should a Notice of Readiness be tendered?
When the vessel has arrived at the place stated in the charter party and is ready in all respects to load or discharge. Laytime usually starts after the notice time allowed in the charter party, so check its NOR clause (for example WIBON, WIPON, WCCON) before tendering.
What is a Letter of Protest used for?
It puts on record a fact the master disputes or wants noted, such as delay caused by the terminal, cargo damage on receipt or a short delivery of bunkers, so that owners keep their rights for later claims under the charter party or with P&I.
Is a Letter of Indemnity safe to accept?
An LOI for delivery without original bills of lading or for a change of discharge port shifts risk to the party giving it, but the owner may still lose P&I cover if it is not in the wording agreed by the club. Check with owners and P&I before accepting one.
Is the Documents Generator free?
Generating and copying the text is free. PDF download and sharing include one free export, after which a paid upgrade is needed.