← All Tools
Ballast Water Management

The BWM Convention explained — D-1 exchange vs D-2 treatment standards, documentation, and practical notes.

⚠ General guidance only. Always follow your vessel's approved Ballast Water Management Plan (BWMP) for the exact procedures that apply to your ship.
What Is the BWM Convention

The International Convention for the Control and Management of Ships' Ballast Water and Sediments (BWM Convention) exists to prevent the spread of harmful aquatic organisms and pathogens carried in ballast water from one region to another — a genuine and well-documented ecological problem historically caused by ships taking on ballast in one port and discharging it, along with whatever organisms it contains, in a completely different ecosystem.

The Convention entered into force in 2017 and now applies broadly across the international merchant fleet, requiring ships to manage their ballast water according to one of two standards, moving over time from an interim exchange-based approach toward mandatory treatment.

Built for verified crew and companies

Free tools for everyone — plus a verified profile that gets you found directly.

⚓ I'm Crew — Join Free🏢 Hiring? Find Crew

About this tool

A practical guide to the International Convention for the Control and Management of Ships' Ballast Water and Sediments (BWM Convention), in force since 2017. It explains the D-1 exchange and D-2 treatment standards, the move to treatment systems, the certificate, plan and record book a ship must carry, and what PSC inspectors commonly check.

How to use it

  1. Read what the BWM Convention is for and when it applies.
  2. Compare the D-1 exchange standard with the D-2 performance standard.
  3. Check the Documentation tab against the BWM Certificate, BWMP and Ballast Water Record Book on board.
  4. Use the Practical Notes for local requirements and BWTS failure reporting.

Frequently asked questions

What is the difference between D-1 and D-2?

D-1 is ballast water exchange: at least 95% volumetric exchange, or pumping three times the tank volume, at least 200 nm from land in 200 m depth. D-2 limits the viable organisms and indicator microbes in discharged ballast and needs an approved treatment system.

Which ships need a BWM Certificate?

Ships of 400 GT and above on international voyages, excluding floating platforms, FSUs and FPSOs, must carry an International Ballast Water Management Certificate.

When did ships have to meet D-2?

Ships had to move from D-1 to D-2 at their first IOPP renewal survey after 8 September 2019, with all ships expected to comply by 8 September 2024.

What happens if the BWTS fails?

Report it through your SMS, inform the flag and the next port state, and follow the contingency measures in the BWM Convention guidance. Do not discharge untreated ballast without the port state's agreement.

🏠Main⚓Join💬Chat Room🏢Hire💼Jobs
💬 Chat Room